中文字幕无码无码专区,日本体内she精高潮,日日摸夜夜添最新无码,久久国产日韩综合,一本一本久久a久久,日本丶国产丶欧美色综合,羞羞色男人的天堂,偷拍激情视频一区二区三区 上海金泰工程機(jī)械有限公司
上海安亭洛浦路45號(hào) 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

主站蜘蛛池模板: 久久午夜无码免费| 国产成人精品日本亚洲77美色 | 国产日产欧产精品精乱子| 男人边吃奶边做呻吟免费视频| 在线精品免费视频无码的| 久久97超碰色中文字幕总站| 98精品国产综合久久久久久欧美| 宅男午夜成年影视在线观看| 成人无码a区在线观看视频| 人妻精品动漫h无码中字| 欧美精品黑人粗大破除| 加勒比中文字幕无码一区 | 99久久国产综合精品swag| 精品国产一区二区三区麻豆| 人人爽人人爽人人片av亚洲| 国产剧情无码播放在线观看| 国产又爽又黄又刺激的视频| 中文字幕亚洲无线码a| 国产av无码精品色午夜| 曰本a∨久久综合久久| 久久精品国产99精品最新| 天天av天天翘天天综合网| 亚洲国产日韩制服在线观看| 亚洲日韩在线a视频在线观看 | 在线a亚洲老鸭窝天堂| 国内熟妇人妻色在线视频| 国产69精品久久久久乱码| 131美女mm爱做爽爽爽视频| 亚洲最大av无码网站| 成年日韩片av在线网站| 亚洲欧美日韩中文无线码| 欧洲美熟女乱又伦免费视频| 国产在线视频一区二区三区欧美图片| 亚洲精品无码成人a片蜜臀| av无码天一区二区一三区| 国产午夜亚洲精品国产成人| 国产精品久久久久久tv| 无码免费无线观看在线视| 国产亚洲欧美另类一区二区 | 强奷乱码中文字幕熟女一| 亚洲中文字幕久爱亚洲伊人 |