中文字幕无码无码专区,日本体内she精高潮,日日摸夜夜添最新无码,久久国产日韩综合,一本一本久久a久久,日本丶国产丶欧美色综合,羞羞色男人的天堂,偷拍激情视频一区二区三区 上海金泰工程機械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

主站蜘蛛池模板: 2020国产亚洲美女精品久久久| 国产美女被遭高潮免费网站| 亚洲综合图片区自拍区| 国产超碰97人人做人人爱| 日本老熟欧美老熟妇| 国产精品福利一区二区久久 | 无遮挡h肉动漫在线观看| 欧美影视精品久久| 51国产黑色丝袜高跟鞋| 免费无遮挡在线观看网站| 人妻av无码系列一区二区三区| 国产熟女一区二区三区四区五区| 国产成人无码牲交免费视频| 久久亚洲精品情侣| 亚洲乱码一区二三四区ava| 亚洲中文字幕无码永久在线不卡| 亚洲色噜噜网站在线观看| 亚洲中文字幕aⅴ无码天堂| 2019午夜三级网站理论| 少妇激情作爱视频| 国产亚洲精aa在线观看see| 国产又色又爽又黄的在线观看视频| 国产99久久久国产无需播放器| 97久久超碰国产精品…| 国产做爰xxxⅹ久久久| 亚洲精品99久久久久久欧美版| 无码人妻一区二区三区免费看| 日日噜噜噜夜夜爽爽狠狠视频| 国产成人精品免费视频大全软件| 久久久综合九色综合88| 成人国产精品??电影| 成视频年人黄网站免费视频| 97碰成人国产免费公开视频| 国产亚洲欧美另类一区二区| 人妻少妇中文字幕久久| 日本亚洲欧美综合在线| 亚洲三级高清免费| 国产成人精品无缓存在线播放| 国产精品美女乱子伦高潮| 成人精品av一区二区三区| 超碰色偷偷男人的天堂|